禹州电厂一期主厂房工程清水混凝土施工工艺 被引量:6

AS-CAST-FINISH CONCRETE TECHNOLOGY IN CONSTRUCTION OF MAIN PLANT OF YU ZHOU POWER PLANT PHASE 1
下载PDF
导出
摘要 禹州电厂一期主厂房柱、梁、板等构件均采用清水混凝土施工工艺。梁、柱模板采用拼装大块钢模板表面粘贴PVC板 ;现浇板采用20mm厚九合板表面粘贴PVC板工艺 ,混凝土搅拌时严格控制水灰比和坍落度 ,分层振捣均匀、密实 ,以保证清水混凝土构件色泽一致 ,平整美观 。 As-cast-finish concrete technology was adopted in the works of columns, beams and floor slabs of main plant of Yu Zhou power plant phase 1.Huge spliced steel forms stuck with PVC board were used for concrete pouring of beams and columns.Slabs were poured with forms of 20 mm nine-ply board covered with PVC board.When mixing concrete, mixing ratio and slump were controlled strictly,at the same time the concrete were well vibrated at different depth so as to ensure a uniform colour of the concrete and a smooth,good looking surface and accurate dimensions as well.
作者 李强
出处 《建筑技术》 北大核心 2000年第9期595-597,共3页 Architecture Technology
关键词 清水混凝土 大模板 PVC板 施工工艺 as-cast-finish concrete huge forms PVC board
  • 相关文献

同被引文献18

引证文献6

二级引证文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部