摘要
通过对阳坡灰场工程设计,分级加筑子坝增加库容,针对灰场工程地质条件,采取恰当的地基处理和防渗措施;重点对山谷灰场进行了渗流分析计算,评价了坝体和坝肩的渗透稳定性,制定了多项坝体及坝肩相应的防、排渗工程措施,确保整个灰场安全运行。
Through design of the sunny slope of the ash pond project, the storage capacity is increased by building sub-dams of different levels. Based on the geological conditions of the ash pond project, proper measures are taken to treat the founAation and prevent the leakage. Focusing on the leakage analysis and calculation of the valley ash pond, this article evaluates the infiltration stability of the dam body and dam shoulders and establishes several construction measures of leakage prevention and drainage of the dam body and dam shoulders, so as to ensure the safe operation of the whole ash pond.
出处
《山西电力》
2013年第1期69-72,共4页
Shanxi Electric Power
关键词
山谷灰场
渗流
初期坝
灰渣筑坝
valley ash pond
leakage
primary dam
ash and slag dam