摘要
结合昆明市第九、第十污水处理厂工程,探讨了在土地限制和出水水质标准提高等约束条件下的城市污水厂的设计,利用一套AAOA/MBR工艺,采用地下组团式布置形式,将主要处理构筑物设于地下,地上用作绿化景观,较好地应对了用地紧张和出水水质要求高的制约因素。
Combined with the ninth and tenth WWTP projects in Kunming, the design of WWTP in a city under the conditions of limited land and high requirements for effluent quality was discussed. The AAOA/MBR process is applied by adopting the underground group layout, allowing the main struc- tures to be located underground while the green landscape on the ground, which can solve the above problems.