摘要
通过列举当前网络系统综合防雷工程设计和施工中常见的错误做法,全面分析了错误的原因及其危害。针对种种错误做法,给出了详细具体改正措施。对于凯文接法减少被保护设备雷电感应电压的原理,进行了详细地计算说明。对类似工程的设计和施工具有一定的指导作用。
By listing common mistakes of design and construction on integrated lightning protection in current network system, the mistake reasons and its hazards are comprehensively analyzed. According to these mistakes,specific corrective measures are given out. This paper makes a detailed introduction for the principle that Kevin connection can reduce lightning induced voltage of protected equipment, which plays a guiding role to improve the design and construction of similar proiects.
出处
《气象水文海洋仪器》
2013年第1期91-93,97,共4页
Meteorological,Hydrological and Marine Instruments
关键词
综合防雷
错误分析
改正措施
integrated lightning protection
mistake analysis
corrective measures