期刊文献+

山东吉戈庄金矿复杂倾斜极薄矿脉开采方法的研究 被引量:3

Study of Mining Method for Complicated Inclined and Thin Vein of Jigezhuang Gold Mine in Shangdong Province
下载PDF
导出
摘要 针对吉戈庄金矿原有采矿方法存在的回采贫化率高、顶板安全性差和生产成本高等问题,根据该矿的实际情况,提出了顺路斜道菱形单元全面削壁充填连续采矿法和斜长壁工作面矿岩分采房柱空场采矿法。通过技术比较和综合经济比较得出:全面削壁充填连续采矿法采场顶板安全性好,采准布置简单,采切比小且采矿损失率小,采矿贫化率低。最终,确定顺路斜道菱形单元全面削壁充填连续采矿法为适合吉戈庄金矿开采的较优方案。该方法的使用可避免遗留采空区,提高采场安全性,而且能够充分发挥选厂的工作效率,从而提高矿区经济效益。 The mining method of Jigezhuang gold mine which increasing the mining dilution rate, mining risk and production cost is unsuitable.Aiming at these problems,two new mining methods are proposed according to the practical situation,which is resuing stoping and room and pillar open stoping.By technical and economic comparison,the resuing stoping is chosen,because the method decreases the stripping ratio,dilution rate and mining loss,improves the roof safety and simplify the stope layout.In this way,the goal of the mine will be decreased,which will achieve greater security.The usage of this mining method will also improve the plant efficiency and economic benefits.
出处 《黄金科学技术》 CSCD 2013年第1期49-52,共4页 Gold Science and Technology
关键词 倾斜极薄矿脉 菱形单元 削壁充填 房柱空场采矿法 经济效益 Inclined and thin vein Rhombic unit Resuing stoping Room and pillar open stoping Economic benefits
  • 相关文献

参考文献7

二级参考文献27

共引文献16

同被引文献37

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部