摘要
为提高山区风电场建设管理质量,基于中国电力工程顾问集团西南电力设计院的山区风电场工程岩土勘测实践,将山区风电场工程岩土勘测划分为工程规划阶段、预可行性研究阶段、可行性研究阶段和初步设计四个阶段,并明确各阶段的勘测内容和方法。
The study is made based on the geo-technical surveying practices by Southwest Electric Power Design Institute of China Power Engineering Consulting Group. The geotechnical survey of mountain wind farms are divided into the stages of pro j ect planning, pre feasibility study, feasibility study and preliminary design, with investigation contents and methods defined in each stage.
出处
《地质灾害与环境保护》
2013年第1期44-46,共3页
Journal of Geological Hazards and Environment Preservation
关键词
山区风电场
勘测
阶段划分
mountain wind farm
investigation
phase division