摘要 简要介绍了某综合楼的工程概况、场地地质条件和整体基础方案。在此基础上,就该基础工程出现的抗拔钻孔灌注桩桩基偏位情况进行了原因分析,并重点介绍了采用局部加大基础梁的断面和配筋及局部加大底板厚度的加固处理方案。竣工后沉降值实测数据表明,该综合楼的最大累计沉降量为1.2mm,最大差异沉降量为1.8mm,且均在规范允许的范围内并完全满足了使用要求。 The general situation, geological conditions and base case of an integration building were introduced in brief. And the deviation of anti-pulling-out post-injecting paste bored pile of the project was analysed, and the reinforced scheme of a larger base beam diameter and a thicker bottom was focused on. The sedimentation value was tested after the project had been completed and the data showed the largest accumulated subsidence value was 1.2 mm and the largest relative subsidence value was 1.8 ram, which was in the designing tolerance and satisfied the use requirements.
出处 《水泥工程》 CAS 2012年第3期89-92,共4页 Cement Engineering
关键词 抗拔钻孔灌注桩 桩基偏位 加固处理 沉降量 anti-pulling-out post-injecting paste bored pile deviation of pile foundation reinforced treatment subsidence value
  • 相关文献

参考文献1

二级参考文献6

共引文献1

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部