摘要
北方某城镇现有供热面积约70万平方米,热源规模为3×35t/h+2×C6汽轮发电机组,建设单位拟对现有热网采用低真空供热方式,该文论述了该方案是否可行,并通过论证阐明不拆换管道方案是不可行的。
The power supply area of north part of China is about 0.7 million m2 and the heat source size is 3×35t/h+2×C6 turbo-generator unit.The particle discusses the possibility of the scheme that the construction unit tries to apply low vacuum heating to the existing heat-supply network and proves the impossibility of non-demolishing pipeline scheme.
出处
《林业科技情报》
2013年第1期61-61,72,共2页
Forestry Science and Technology Information
关键词
低真空
加压泵站
比摩阻
供热方案
可行性
low vacuum
booster pump station
specific frictional resistance
power supply plan
possibility