期刊文献+

采矿方法转变中的隔离矿柱稳定性分析 被引量:6

Stability Analysis of Insulating Pillar in the Process of Mining Method Change
下载PDF
导出
摘要 隔离矿柱在矿山开采中对维护矿山稳定具有重要的作用。结合某矿的实际情况,在矿山进入深部开采并转变采矿方法的过程中,采用极限平衡理论计算得出了隔离矿柱厚度为10 m。应用二维数值计算软件RFPA对其稳定性进行了分析研究。结果表明,留设10 m隔离矿柱可以维持采场的稳定,满足矿山生产的要求。 Insulating pillar plays an important role in the stability maintenance of mine during mining. During the process of mining method change with the mining depth increasing, the limit equilibrium method is used to calculate out that the thickness of insulating pillar is 10 m according to the field engineering condition of a mine. With the use of 2D numeri- cal calculation software RFPA, the mine stability is analyzed and the result shows that the 10-meter thickness insulating pil- lar can maintain the stability of stope and meet the demand of mine production.
出处 《金属矿山》 CAS 北大核心 2013年第4期71-73,共3页 Metal Mine
基金 "十二五"国家科技支撑计划项目(编号:2011BAB05B00) 湖北省自然科学基金项目(编号:ZRY1763)
关键词 采矿方法 隔离矿柱 稳定性 数值模拟 Mining method, Insulating pillar, Stability, Numerical simulation
  • 相关文献

参考文献12

二级参考文献54

共引文献413

同被引文献51

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部