摘要
文章通过分析传统二维设计在设计阶段存在的一些缺陷与不足,以某卷烟厂技改工程在设计阶段应用BIM为例,从BIM设计组织,主要任务确定,三维模型建立,管线综合,碰撞检查,工程量清单统计等方面探讨了BIM在该工程设计阶段的具体做法,并对BIM的经验和不足进行了总结分析,指出BIM的应用对有效解决二维设计中存在的问题将起到积极的作用。
Taking the application of BIM in technical transformation design stage of a cigarette factory as example, this article analysed some defects and deficiencies of the traditional 2D design in design stage.Discussed the specific practice of BIM in the technical trans- formation project design stage, such as design organization, the main task of determining, 3D modeling, pipeline comprehensive, colli- sion checking, statistics list of project quantities etc, and summarized the experience and deficiency of BIM.This article pointed out the application of BIM will play a positive role in 2D design problem solving.
出处
《企业技术开发》
2013年第5期50-52,69,共4页
Technological Development of Enterprise
关键词
BIM
技改工程
设计
BIM
technical transformation
design