泸定水电站坝基高水头深厚覆盖层帷幕灌浆施工技术研究 被引量:5

Study on construction technology of curtain grouting for deep overburden upon dam foundation under high head for Luding Hydropower Station
下载PDF
导出
摘要 泸定水电站库区地基帷幕灌浆在深厚覆盖层内进行,通过采取一系列针对性措施,克服了钻孔涌水、覆盖层成孔工效低及承压条件下灌浆施工等难点,保证了工程的顺利推进,达到了预期的施工效果。该工程特性、难点及处理措施对今后高水头下深厚覆盖层灌浆工程施工具有一定的参考价值和借鉴作用。 As the curtain grouting for the dam foundation within the reservoir area of Luding Hydropower Station is carried out in a deep overburden, a series of pertinent construction measures are adopted to overcome the difficulties such as drill-hole water gushing, lower hole-forming efficiency, grouting under bearing pressure condition, etc. , and then smooth implement of the con- struction is ensured and the expected construction effect is obtained as well. The characteristics, difficulties and the relevant treatment measures have a certain reference value and effect for the construction of the similar project in the days to come.
出处 《水利水电技术》 CSCD 北大核心 2013年第5期1-3,9,共4页 Water Resources and Hydropower Engineering
关键词 泸定水电站 深厚覆盖层 帷幕灌浆 施工技术 Luding Hydropower Station deep overburden curtain grouting construction technology
  • 相关文献

同被引文献29

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部