云南黑龙水电站坝型选择初探 被引量:6

Selection of Dam Type of Heilong Hydropower Station
下载PDF
导出
摘要 碾压混凝土坝具有温控措施简单、施工快、水泥用量少、投资省等优点,碾压混凝土技术在国内外大坝建筑中得到了广泛应用和发展。在预可行性研究阶段,从黑龙水电站坝址地形地质、枢纽布置、筑坝材料、施工、运行、投资及工期等方面,对碾压混凝土重力坝及混凝土面板堆石坝两种坝型进行分析比较后,初拟碾压混凝土重力坝为代表性坝型。 Roller compacted concrete dam have many advantages such as simple temperature control measure, easy con- struction, less cement usage, less investment etc., and it was widely used throughout the world. At the pre-feasibility study of Heilong hydropower station, roller compacted concrete gravity dam and rockfill dam with concrete facing were compared from topographic and geologic condition, project layout, dam material, construction condition, station opera- tion, project investment and construction period, roller compacted concrete gra,city dam was recommend finally.
出处 《水科学与工程技术》 2013年第2期58-61,共4页 Water Sciences and Engineering Technology
关键词 水电站大坝 坝型选择 碾压混凝土重力坝 hydropower dam selection of dam type roller compacted concrete dam
  • 相关文献

参考文献7

  • 1广西南宁水利电力设计院.云南黑龙水电站工程预可行性研究报告[R].
  • 2DL/T5005—1992,碾压混凝土坝设计规范[S].
  • 3DL5108-1999.混凝土重力坝设计规范[S].[S].,..
  • 4DL/T5016-1999.混凝土面板堆石坝设计规范[S].[S].,2000..
  • 5张光斗 王光纶.水工建筑物[M].北京:水利电力出版社,1994.93-113.
  • 6华北水利学院主编.水工设计手册(第5卷)[K].北京:水利电力出版社.1989.
  • 7于忠政,雷兴顺.大朝山水电站碾压混凝土重力坝设计[J].水力发电,1998,24(9):36-39. 被引量:4

共引文献141

同被引文献15

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部