期刊文献+

钻孔灌注桩后注浆的扩散模拟计算 被引量:2

Diffusion Simulation and Calculation of Post-Grouted Bored Piles
下载PDF
导出
摘要 简要介绍了FLAC3D程序基于多孔连续介质的渗流理论。通过考虑注浆浆液的粘度和渗透系数的时变性,以及多孔介质的流体流动方法,采用FLAC3D软件模拟分析了某超高层建筑钻孔灌注桩桩端后注浆的扩散范围,得到其在桩端以下为半椭球体。 This paper introduces the porous continuous media seepage theory based on the software FLAC3D. It considers the time-varying property of viscosity and permeability of grout. With the fluid flow method of por- ous media, FLAC3 D was used to simulate and analyze the diffusion area of post-grouted bored piles of a super- high-rise building. It was found that the shape of diffusion area is similar to a semi-ellipsoid.
作者 贺剑龙 巢斯
出处 《结构工程师》 北大核心 2013年第2期136-140,共5页 Structural Engineers
关键词 桩端后注浆 扩散范围 时变性 pile-end post groutd, diffusion area, time-varying property
  • 相关文献

参考文献4

二级参考文献11

  • 1华南理工大学,浙江大学,湖南大学.基础工程[M].北京:中国建筑工业出版社,2006.
  • 2Bruce D A. Enhancing the performance of large diameter piles by grouting [ J ]. Grouting Engineering, 1986(5) :9-15.
  • 3Ho C E, Lira C H, Tan C G. Characteristics of Bored Piles Installed Through Jet Grout Layer [J]. Journal of Performance of Constructed Faci|ities, 2002 ( 11 ) : 160-168.
  • 4Baker C. Comments on paper 'Rock Stabilization in Rock Mechanics'[A]. Muler, Springer-Verlag NY,1974.
  • 5Charles E. Rheological evaluation of cement slurries methods and models[A]. S P E 9284[C]. 1980.
  • 6Ivan Odler. Oil Cemento[M]. 1978, 303 - 309.
  • 7Ish-shalom M, Greenberg S A. The Rheology of Fresh Portland Cement Pastes[A]. Proceedings of 4th International Symposium Chemistry Cement[C]. 1960,721.
  • 8Hassler L, et al. Simulation of grouting in jointed rock[A]. Proc 6th Int Conf on Rock Mech[C]. 1987.
  • 9周永明,翁雁麟,益德清.卵石层后压浆灌注桩承载力设计及试验分析[J].结构工程师,2008,24(4):85-88. 被引量:5
  • 10李继广,刘彦祥.后注浆技术提高钻孔灌注桩承载力的分析[J].水道港口,2010,31(1):65-68. 被引量:20

共引文献279

同被引文献17

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部