随着智能电网的进一步推进,分布式多Agent系统在电力系统中的应用更加广泛。多Agent系统中符节点的功能有限,Agent间主要借助通信来相互协作与信息共享,以实现多Agent系统的设计目标。因此,分布式的多Agent系统的网络通信是非常频繁的,而且其通信量及对网络造成的负荷也需要详细的考虑。论文针对电力系统中多Agent系统的特点,在设计和部署之初对Agent系统的通信方式进行优化,以降低由多Agent系统所造成的网络通信负荷,提高网络的服务质量。
With the Smart Grid further progresses, distributed Multi-Agent Systems (MAS) are used more widely in electric power system applications.In MAS, each node functions are limited, agents mainly use communications to share cooperation and information mutually to obtain the whole system excellent design goals.As a result, the agents network communications are very frequent and have large amounts of traffic loads, these situation need further careful consideration and design to achieve communication efficiency.This article puts forward a planning method to optimize the MAS communications means at the system design and deployment phase, and this method has considered the MAS real time characteristics needs in Electric Power application system to improve network service quality and reduce the network load.
出处
《电气试验》
2013年第2期35-38,共4页
Electrical Test
关键词
多AGENT系统
电力分布式应用
区域划分
网络负荷
Multi-Agent Systems
electric power system distributed application
regional partition
network load