摘要
结合旧三山南桥拆除施工,探讨实施了一种拆除混凝土拱桥的新方法。工程实践表明,该方法利用旧桥已有的有利条件,安全、简便、实用、高效。
Based on the old Sanshan bridge dismantles the constructions proposed a new method to remove the conerete arch hridge. Engineering practice shows that the implementation of the method is more secure, simple, efficient, and references for similar projeets.
出处
《广东公路交通》
2013年第2期45-47,共3页
Guangdong Highway Communications
关键词
组合式连续拱桥
旧桥
拆除
comhined continues arch bridge
dismantling of old bridge
scheme