摘要
针对波浪作用下导管架码头结构施工期稳定性问题,阐述了导管架在海上浮运、海上存储、现场定位安装等阶段的施工工艺流程及施工技术要求,以确保导管架施工期的稳定安全。可为导管架施工提供试验参考依据。
Based on the analysis of the stability of jacket wharfs under the action of waves during their construction,the paper presents the technological process and requirements for installation of jackets during offshore transportation,storage,and positioning and installation of the jackets to ensure the safety and stability of the jacket structures during the installation,which may provide test data and reference for offshore transportation,storage,and positioning and installation of jacket structures.
出处
《中国港湾建设》
2013年第3期71-73,共3页
China Harbour Engineering
关键词
导管架
施工工艺
施工技术要求
jacket
technological process
technical requirement