摘要
介绍了大庆油田热电厂 1号机组DCS改造工程中电气主系统的设计原则 ,以电厂实际设备为例 ,简述了在DCS系统中对电气设备进行监控 ,保证电气主系统安全运行的方案 ,可供电厂改造和设计参考。
Presents the design principle followed for primary electrical system during upgrading DCS for No.1 power generating set at Daqing Oil Field Thermal Power Plant, and taking the actual equipment available as examples, briefly describes the monitoring of electrical equipment in the DCS system to ensure safe operation of primary electrical system.
出处
《黑龙江电力》
2000年第4期27-29,32,共4页
Heilongjiang Electric Power