期刊文献+

延迟制造技术条件下单螺杆式压缩机生产改进研究 被引量:1

Study of improvement for single-screw compressor production system with application of postponement manufacturing technique
下载PDF
导出
摘要 基于延迟制造技术的基本理论,主要研究单螺杆式压缩机的生产方法。分析运用延迟制造技术后,生产管理方面的变化情况,重点研究采用延迟制造技术后有关单螺杆式压缩机生产计划编制和工艺方法。最后对于延迟制造技术和大规模定制的广泛应用进行分析、总结。 Based on the basic theory of postponement manufacturing technique (PMT), the manufacturing method of single-screw compressor is studied. The change of production and management after adopting the PMT is analyzed. The relevant plan formulation and technique of PMT for single-screw compressor are researched. Finally, the wide application of PMT and mass customization are summarized.
作者 陈蔚风
机构地区 上海交通大学
出处 《制冷与空调》 2013年第5期67-70,50,共5页 Refrigeration and Air-Conditioning
关键词 延迟制造 单螺杆式压缩机 大规模定制 postponement manufacturing single-screw compressor mass customization
  • 相关文献

参考文献4

二级参考文献15

  • 1邵晓峰,季建华.大规模定制中延迟策略对库存成本的影响[J].系统工程理论方法应用,2004,13(5):385-389. 被引量:20
  • 2王海军,马士华,赵勇.大量定制环境下基于延迟制造的多级供应控制模型研究[J].管理工程学报,2005,19(1):6-9. 被引量:22
  • 3姚建明,蒲云,周国华,赵正佳.多品种供应的多供应商选择模型及分解算法[J].西南交通大学学报,2005,40(4):519-524. 被引量:12
  • 4LEE H L. TANG C. Modeling the costs and benefits of delayed product differentiation [ J ]. Management Science, 1997, 43 (1): 40-53.
  • 5GUPTA D, BENJAAFAR S. Make-to-order, make-to- stock, or delay product differentiation: a common framework for modeling and analysis[ J ]. IIE Transactions, 2004, 36(6): 529-546.
  • 6BRUN A, ZORZIN M. Evaluation of product customization strategies through modularization and postponement [ J ]. International Journal of Production Economics, 2009, 120(1 ): 205-220.
  • 7JEWKES E M, ALFA A S. A queuing model of delayed product differentiation[ J ]. European Journal of Operational Research, 2009, 199(3) : 734-743.
  • 8SUA J C P, CHANGB Y L, FERGUSON M. Evaluation of postponement structures to accommodate mass customization[ J ]. Journal of Operations Management, 2005, 23(3/4): 305-318.
  • 9LEUNG S C H, WAN-LUNG N G. A goal programming model for production planning of perishable products with postponement[ J ]. Computers and Industrial Engineering, 2007, 53 (3): 531-541.
  • 10LI Jian, WANG Shouyang, CHENGB T C E. Analysis of postponement strategy by EPQ-based models with planned backorders [ J ]. The International Journal of Management Science, 2008, 36 (5) : 777-788.

共引文献20

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部