摘要
新时期,我国隧道工程的施工技术与工艺水平实现了大幅度的提升,极大地改进了隧道工程的建设状况,为国家发展建造了诸多良好性能的隧道。但是,超挖现象在当前的隧道施工中依然较为严重,成为影响隧道质量、诱发安全事故的主要因素,必须得到有效地解决。本文以隧道的超挖现象为主题,通过分析诱发超挖现象的因素,谈论了对超挖现象进行预防及控制的具体措施。
In the new period, the construction technology and technological level of tunnel engineering in China has greatly improved, greatly improved the status of the tunnel construction, building many good performance of the tunnel for the development of the country. However, the phenomenon of overbreak still serious in tunneling current, become the main factor affecting the safety accidents evoked quality, tunnel, must be solved effectively. The paper taking the overbreak phenomenon of tunnel as the theme, through the analysis of induced factors of overbreak phenomenon, talked about the prevention and controlling measures of overbreak phenomenon.
出处
《城市建筑》
2013年第2期112-112,121,共2页
Urbanism and Architecture
关键词
隧道工程
施工超挖
预防
控制
tunnel project
the construction of overbreak
prevention
control