期刊文献+

多目标混流装配线再平衡模型与算法 被引量:14

Multi-objective mixed-model assembly line rebalancing:Model and algorithm
原文传递
导出
摘要 当新产品引入时,混流装配系统常常需要再平衡以保持各工作台上的负荷均衡.文章考虑混装线再平衡时的调整成本和生产效率,提出了度量调整成本的新方法,建立了混流装配线再平衡问题的多目标优化模型,并采用多目标遗传算法对该问题进行了求解.通过对经典问题的计算实验,以及与Merengo等提出的混装线平衡算法的对比分析,结果表明多目标遗传算法可以有效地求解混装线再平衡问题. Within the lifetime of a modern production system, mixed-model assembly line rebalancing problems caused by new product introduction are frequently aroused. This paper considered the rebal- ancing cost and e^cieney of the new line simultaneously. A new method evaluating rebalancing cost was proposed and the rebalaneing model was formulated. A multi-objective genetic-algorithm was developed to solve this problem. The performance of the algorithm was tested on mixed-model balancing benchmark problems. Experimental results show that this algorithm can solve the rebalancing problem effectively and outperforms algorithm proposed by Merengo et al.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2013年第8期1956-1964,共9页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71001083 71201121) 教育部高等学校博士学科点基金(200806981064)
关键词 混装线 再平衡 多目标优化 遗传算法 mixed-model assembly line rebalancing multi-objective optimization genetic algorithm
  • 相关文献

参考文献15

  • 1李斌,陈立平,黄正东,肖人彬,钟毅芳.面向大规模定制的装配线优化调度研究[J].中国机械工程,2005,16(24):2198-2202. 被引量:14
  • 2Boysen N, Fliedner M, Scholl A. A classification of assembly line balancing problems[J]. European Journal of Operational Research, 2007, 183(2): 674-693.
  • 3Watkins R E, Cochran J K. A line balancing heuristic case study for existing automated surface mount assembly line setups[J]. Computers & Industrial Engineering, 1995, 29(1): 681 -685.
  • 4Ramirez-Campos S M, Trevino L M T, Campos M G C, et al. Assembly line reconfiguration under distur- bances: An evolutionary approach to decision making[C]//Proceedings of the 15th International Conference on Computing, Mexico City, 2006: 24-32.
  • 5Thomopoulos N T. Line balancing sequencing for mixed-model assembly[J]. Management Science, 1967, 14(2): 59-75.
  • 6Thomopoulos N T. Mixed model line balancing with smoothed station assignments[J]. Management Science, 1970, 16(9): 593- 603.
  • 7Merengo C, Nava F, Pozetti A. Balancing and sequencing manual mixed-model assembly lines[J]. International Journal of Production Research, 1999, 37(12): 2835-2860.
  • 8Miltenburg J. Balancing U-lines in a multiple U-line facility[J]. European Journal of Operational Research, 1998, 109(1): 1-23.
  • 9Corominas A, Pastor R, Plans J. Balancing assembly line with skilled and unskilled workers[J]. Omega The International Journal of Management Science, 2008, 36(6): 1126-1132.
  • 10Gamberini R, Grassi A, Riminia B. A new multiobjective heuristic algorithm for solving the stochastic assembly line re-balancing problem[J]. International Journal of Production Economics, 2006, 102(2): 226 -243.

二级参考文献10

  • 1Tseng M M.Design by Customers for Mass Customization Products.Annals of the CIRP,1998,47(1) :103~110
  • 2Miltenburg G J.A Theoretical Basis for Scheduling Mixed Model Production Lines.Mgmt.Sci.,1989,35(1):192~207
  • 3Agnetis A ,Pacifici A.Scheduling of Flexible Flow Lines in an Automobile Assembly Plant.European Journal of Operational Research,1997,97(2):348~362
  • 4Leu Y,Matheson L A,RessL P.Sequencing Mixed Model Assembly Lines with Genetic Algorithms.Computers and Industry Engineering,1996,30(4):1027~1036
  • 5Schaffer J D.Multiple Objective Optimization with Vector Evaluated Genetic Algorithms.1st Int.Conf.Genetic Algorithms and Their Applications,Pittsburgh,1985
  • 6Fonseca C M,Fleming P J.Genetic Algorithms for Multiobjective Optimization:Formulation,Discussion and Generalization.Proc.5th Int.Conf.Genetic Algorithms,Urbana,Illinois,USA,1993
  • 7Ritzel B J,Eheart J W.Using Genetic Algorithms to Solve a Multiple Objective Groundwater Pollution Containment Problem.Water Resource Res.,1994,30(1):589~1603
  • 8Goldberg D E.Genetic Algorithms in Search,Optimization and Machine Learning.Reading,MA:Addison-Wesley,1989
  • 9Horn J,Nafpliotis N,Goldberg D E.A Niched Pareto Genetic Algorithm for Miltiobjective Optimization.Proc.of 1st IEEE-ICEC Conference,Orlando,Florida,USA,1994
  • 10赵伟,韩文秀,罗永泰.准时生产方式下混流装配线的调度问题[J].管理科学学报,2000,3(4):23-28. 被引量:34

共引文献13

同被引文献130

引证文献14

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部