地铁隧道盾构法施工全过程风险分析 被引量:22

Analysis of Risks in Overall Process during the Construction Period of Metro Shield Tunnel Construction
下载PDF
导出
摘要 由于地铁隧道盾构法施工工程中勘察、设计、施工等方面存在大量的风险因素,其不确定性、复杂性都增加了风险分析的难度,一般的风险分析方法不能较好地评估地铁隧道盾构法施工工程风险。本文提出了基于模糊综合分析的地铁隧道盾构施工风险评估方法,以初步统计的地铁隧道盾构法工程质量安全事故数据和专家调研数据为基础,首先构建地铁隧道盾构法施工的风险清单,然后采用模糊对数概率和模糊对数损失率的概念对风险事件进行定量分析,再求出风险事件的风险值及风险等级隶属度,最后确定地铁隧道盾构法施工工程的总体和每个风险事件的风险等级,该方法的结果与上海市地铁隧道盾构法施工风险水平现状相一致评,其结果可为下一步风险预防和控制提供科学依据。 Because a large number of risk factors existed in the reconnaissance,design and construction of metro shield tunneling as well as their uncertainties and the complexities complicate the difficulties of risk analysis,common methods of analyzing risks cannot serve the assessment of metro shield tunnel construction better.The paper puts forward the method to assess metro shield tunnel construction based on the Fuzzy Synthetic Evaluation.It,in the basis of initially collected data of quality safety of metro shield tunnel construction and researches conducted by experts,firstly,builds the risk lists of metro shield tunnel construction;secondly,conducts quantitative analysis of risk events with the concept of fuzzy logarithm probability and fuzzy logarithm loss rate;thirdly,seeks value-at-risk of risk events and risk level membership;finally,determines the risk level of each risk event and the overall risk level of metro shield tunnel construction.The result,making use of the method,is consistent with the risk level of Shanghai metro shield tunnel,which provides scientific proof for further risk prevention and control.
出处 《公路工程》 北大核心 2013年第3期38-41,56,共5页 Highway Engineering
基金 国家自然科学基金面上课题(40972214)
关键词 地铁隧道盾构法施工 模糊综合评估法 风险分解结构 风险分析 metro shield construction Fuzzy Synthetic Evaluation risk breakdown structure risk analysis
  • 相关文献

参考文献9

二级参考文献59

共引文献983

同被引文献150

引证文献22

二级引证文献103

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部