721-2矿井-83m中段西部通风方式的调整

Adjustment of ventilation way of western part of sublevel-83mat 721-2mine
下载PDF
导出
摘要 分析721-2矿井-83m中段西部通风问题,找出问题存在的主要原因,并提出相应的整改措施。实践证明,这些措施是可行的,解决了该中段西部新鲜风入风量不能满足采掘面所需风量的问题,从而确保了工作面通风安全。 Ventilation problems existed in western part of sublevel --83 m of 721-2 mine were analyzed, the main reasons that affect the ventilation effect were identified, and the corresponding mea- sures were put forward. It is proved that these measures were feasible. Through the adjustment of ventilation way of western part of sublevel --83 m, the distance of the intake drift of western part of sublevel --83 m was shortened, and the amount of intake wind of sublevel --83 m was increased, thus ensuring the safe of ventilation in the working area.
出处 《铀矿冶》 CAS 2013年第3期154-157,共4页 Uranium Mining and Metallurgy
关键词 铀矿井 通风方式 调整 uranium mine ventilation way adjustment of ventilation
  • 相关文献

参考文献3

  • 1国防科学技术工业委员会.EJ/T359--2006铀矿井排氡及通风技术规范[S].北京:核工业标准化研究所,2006.
  • 2《采矿设计手册》编委会.采矿设计手册[M].北京:中国建筑工业出版社,1987.
  • 3张国枢.通风安全学[M].徐州:中国矿业大学出版社,2007.

共引文献166

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部