摘要
根据太原市某场地工程地质条件,并通过对承载力、平均沉降量以及软弱下卧层验算等各方面的计算分析,指出将天然地基应用于该高层建筑,充分发挥了地基的潜力,节约了工程成本和工期,具有很好的推广应用价值。
According to the engineering geological conditions of a site in Taiyuan, and through the calculation analysis on bearing capacity, aver- age settlement and weak subsoil checking and other aspects, pointed out applied natural foundation to this high-rise buildings, gave full play to foundation potential, saved the project cost and construction period, had good application value.
出处
《山西建筑》
2013年第26期59-60,共2页
Shanxi Architecture
关键词
高层建筑
天然地基
沉降量
成本
工期
high-rise building, natural foundation, settlement, cost, construction period