大跨径钢管混凝土系杆拱桥先拱后梁法施工技术 被引量:6

A Construction Technology of Arch First & Beam Later Method to Large-span Concrete Filled Steel Tube Tied Arch Bridge
下载PDF
导出
摘要 钢管混凝土系杆拱桥是一种被广泛应用的桥梁结构形式,其施工工艺日趋成熟,但施工安全质量风险仍不可小视。以上海某下承式钢管混凝土系杆拱桥为工程实例,通过对桥梁施工过程的回顾和总结,提出了系杆拱桥施工过程中钢管拱肋加工、吊装定位、混凝土灌注、吊杆安装以及各阶段测量监控的质量控制要点。 Concrete filled steel tube tied arch bridge is a kind of widely used bridge structural system.While its construction technology is becoming mature,risks of construction safety and quality are still not negligible.The paper takes a through-type concrete-filled steel tube tied arch bridge in Shanghai as an example,and it gives essential quality control points of measurement and monitoring at different construction stages such as steel tube arch rib fabrication,hoisting & positioning,concrete casting,hanger rod installation.
作者 孙昆仑
出处 《中国市政工程》 2013年第4期17-19,90,共3页 China Municipal Engineering
关键词 钢管混凝土 系杆拱 先拱后梁 施工技术 concrete filled steel pipe tied arch arch first & beam later construction technology
  • 相关文献

同被引文献21

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部