针对跨流域引水工程中受水水库引水与供水联合调度问题,建立了供水量最大与引水效率最高的多目标联合调度模型,并将其分解成两个单目标调度模型,应用长系列模拟优化的方法,求解受水水库引水与供水联合调度图及其调度规则。以大伙房水库输水应急入连工程规划为基础,采用本文建立的模型方法对其受水水库碧流河水库进行实例研究,先后求解引水期间水库最大可供水量以及如何高效引水的问题。结果表明,进行联合优化调度后,可提高跨流域引水的有效性,从而增加受水水库的综合效益。
Aiming at the joint operation of water transfer-supply for the reservoir in intake area in inter-ba- sin water transfer project, a multi-object operation model has been established on the basis of the maxi- mum water supply and the highest efficiency for diversion. The model is resolved into two single-objective operation models, and then the joint operation chart and its operation rule for water transfer-supply are as- certained by using long series simulation and optimization. Based on the planning of diversion project, the proposed model approaches were used to research the related issues about water transfer-supply for Biliuhe reservoir. The ease study shows that after the optimal operation, it could improve the diversion efficiency and increase the comprehensive benefits of the reservoir in intake area.
出处
《水利学报》
EI
CSCD
北大核心
2013年第8期883-891,共9页
Journal of Hydraulic Engineering
基金
国家自然科学基金资助项目(51079015)
关键词
跨流域引水
受水水库
调度模型
联合调度图
调度规则
inter-basin water transfer
reservoir in intake area
operation model
joint operation chart