煤炭建设项目实施PMC模式的关键问题探讨

Discussion about the Key Problem to Implement PMC Mode on the Coal Construction Project
下载PDF
导出
摘要 文章在分析煤炭建设项目传统的管理模式及其管理现状的基础上,指出煤炭建设项目有待于进一步加强项目管理,并提出有必要将项目管理承包模式应用到煤炭建设项目中,以实现专业化的项目管理。论述了项目管理承包模式的概念和优势,提出了煤炭建设项目实施项目管理承包模式的组织结构,并指出在煤炭建设项目中更好的实施项目管理承包模式的关键问题是要解决好建设单位与PMC单位之间的委托代理问题,包括制定出完善的PMC合同标准文本,引入竞争机制优选PMC单位,建立全面的PMC激励机制,形成有效的PMC约束机制等。 This paper analyzes the traditional management mode and development status of coal construction project,and points out that the project management work about coal construction projects should be strengthened,and the project management contracting(PMC) mode should be applied in coal construction projects to achieve the professional project management.The paper discusses the concept and advantages of PMC mode,presents the organizational structure of PMC mode of coal construction project,and points out the key problem to implement PMC mode better is how to solve the principal-agent problems between construction unit and PMC unit,including developing a perfect PMC contract standard text,accepting the competition mechanism,establishing the comprehensive incentive mechanisms,forming effective constraint mechanism.
出处 《江苏建筑》 2013年第4期111-114,共4页 Jiangsu Construction
关键词 煤炭建设项目 项目管理承包 PMC单位 关键问题 coal construction project project management contracting PMC unit key problem
  • 相关文献

参考文献5

二级参考文献21

  • 1Barrie Donald, Paulson Boyd, Professional Construction Management: Including CM, Design-Construction, and General Contracting, McGraw - Hill, 1992
  • 2Hughes W. P., An Analysis of the JCT Management Contract,Technical Information Service No. 130, CIOB
  • 3Hughes, W. P., An Analysis of Traditional General Contracting,Technical Information Service No. 12, CIOB
  • 4Sidwell A. C., An evaluation of management contracting,Construction Management and Economics, 1(1983)
  • 5Franks James, Building Procurement system: A Client Guide,Addison Wesley Longman, 1998
  • 6Hughes W. P., Murdoch J. R., Construction Contracts: Law and Management, Spon's, 1991
  • 7Construction Management Committee of ASCE Construction Division. (1991), Constructability and constructability programs: White paper, Journal of Construction Engineering and Management(ASCE),1991,2
  • 8Williams Gareth Vaughan, Fast Track Pros and Cons: Considerations for Industrial Projects, Journal of Management in Engineering (ASCE), 1995, 5
  • 9Lee Daphne (2001), Guaranteed Maximum Price Contract: The Singapore Experience, International Conference on Project Cost Management, Beijing, 2001
  • 10深圳市建设工程担保实施办法,2002.

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部