期刊文献+

不确定性区域公交车调度问题的双层规划模型 被引量:3

A Bi-level Programming Model for Uncertain Regional Bus Scheduling Problems
下载PDF
导出
摘要 区域公交调度是未来城市公共交通的发展趋势,主要解决如何合理统一安排最初分布于不同车场的车辆完成所有线路固定时刻表对应班次任务,从而减少车队规模和降低营运成本.考虑现实中许多突发事件干扰车辆按时完成班次,借助双层规划模型,本文探讨区域公交车辆调度和购车计划之间的有机联系,在满足多车型、车场容量限制、燃料限制等现实因素基础上,设计求解上下层模型的遗传算法,引入满意解的概念,将下层规划产生的一组满意解供上层规划比选,进而生成最佳公交车调度方案,以及与之对应的购车计划.最后给出了一个实例,验证模型和算法的正确性和有效性. Regional bus scheduling is the future trend in public transportation which deals with allocating trips belonged to several routes to buses located at different depots to reduce the size of bus fleets and operating costs. Considering many emergency events which may affect on-time vehicle arrivals, a bi-level programming model is applied to address the relationship between bus scheduling and its procurement scheme from an overall perspective. The model takes into consideration several constraints such as depot capacities, fueling, and emissions of polluting gases. Solutions to different situations of the upper and lower model are obtained by using a genetic algorithm. Based on some established criteria for a satisfactory solution, the lower solutions meeting the established criteria are generated for the upper model. Thereby, the best lower and the corresponding upper solutions are generated. Finally, an example is illustrated to prove the accuracy and effectiveness of our model and its algorithm.
出处 《交通运输系统工程与信息》 EI CSCD 北大核心 2013年第4期106-113,共8页 Journal of Transportation Systems Engineering and Information Technology
基金 国家'863'高技术计划资助项目(2007AA11Z201) 国家自然科学基金资助项目(61174188) 华南理工大学中央高校基本科研业务费资助项目(2012ZM0092)
关键词 城市交通 区域公交车辆调度问题 购车计划 双层规划 不确定性 urban traffic regional bus scheduling problem bus procurement scheme bi-levelprogramming model uncertainty
  • 相关文献

参考文献12

  • 1Natalia K, Taieb M, Leena S. A time-space network based exact optimization model for multi-depot bus scheduling [ J ]. European Journal of Operational Research, 2006, 175 : 1616-1627.
  • 2Vitali G, Natalia K, Leena S. Solving large multiple- depot multiple-vehicle-type bus scheduling problems in practice[ J]. OR Spectrum, 2005,27:507-523.
  • 3Wei M,Jin,W Z,Fu W W, et al. Improved ant colony algorithm for multiple depot bus scheduling problem with route time constraints[ C ]. 8th World Congress on Intelligent Control and Automation, 2010:4050-4053.
  • 4刘志刚,申金升.区域公交时刻表及车辆调度双层规划模型[J].系统工程理论与实践,2007,27(11):135-141. 被引量:32
  • 5Haghani A, Banihashemi M. Heuristic approaches for solving large-scale bus transit vehicle scheduling problem with route time constraints [ J ]. Transportation Research, 2002,36: 309-333.
  • 6Wang H, Shen J. Heuristic approaches for solving transit vehicle scheduling problem with route and fueling time constraints [ J ]. Applied Mathematics and Computation, 2007,190 : 1237-1249.
  • 7Li J Q, Mirchandani P B, Borensteln D. A Heuristic for the real-time vehicle rescheduling problem [ J ]. Transportation Research Part E, 2009, 45 ( 3 ) : .1 q-qq.
  • 8Dennis H, Albert P M. A solution approach for dynamic vehicle and crew scheduling [ J ]. European Journal of Operational Research, 2006,172:453-471.
  • 9Li J Q, Head K L. Sustainability provisions in the bus- scheduling problem [ J ]. Transportation Research Part D, 2009,12:50-60.
  • 10Bertoss A A, Carraresi P, Gallo G. On some matching problems arising in vehicle scheduling models [ J ]. NetWorks, 1987,17 (3) :271-281.

二级参考文献24

  • 1刘志刚,申金升,王海星,杨威.基于协同发车的区域公交时刻表生成模型研究[J].交通运输系统工程与信息,2007,7(2):109-113. 被引量:18
  • 2Haghani A, Banihasheml M. Heuristic approaches for solving large-scale bus transit vehicle scheduling problem with route time constraints [ J]. Transportation Research, 2002, 36A:309 - 333.
  • 3Ceder A. Creating bus timetables with maximal synchronization[J]. Transportation Research, 2001, 35A: 913- 928.
  • 4Voss S. Network design formulation in schedule synchronization[ C]//Desrochers Rousseau. Computer-aided Transit Scheduling, Springer, Berlin, 1992: 137- 152.
  • 5Adebis. A mathematical model for headway variance of fixed route buses [J]. Transportation Research, 1986, 20B: 59- 70.
  • 6Lee-KK-T, Shoufeld P M. Real-time dispatching control for coordinated operation in transit terminals[J] . Transportation Research Record, 1994 (1433) : 3 - 9.
  • 7Gavish B, Shifter E. An approach for solving a class of transportation scheduling problems [ J ].European Journal of Operations Research, 1978, 12-134.
  • 8Gavish B, Shifler E. An approach for solving a class of transportation scheduling problems [ J ] . European Journal of Operations Research, 1978, 12-134.
  • 9Bodin L, Golden B. Classification in vehicle routing and scheduling[J]. Networks, 1981, 97 - 105.
  • 10Bertossi A A, Carraresi P, Gallo G. On some matching problems arising in vehicle scheduling models[J]. Networks, 1987, 17: 271 - 251.

共引文献36

同被引文献19

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部