摘要
依据《中长期铁路网规划(2008年调整)》及柳州市城市总体发展规划和预测的枢纽内客货运量增长的需求,在分析柳州铁路枢纽现状的基础上,考虑设计运输能力的适应性、工程投资情况、引入线路的技术特征及已有铁路的设备状况等因素,研究了规划年度引入枢纽各线路的方案和枢纽内客货运布局方案,以及规划年度柳州铁路枢纽布局。
According to the 《medium and long-term railway network plan (2008 Revision)》 and Liuzhouoverall development plan, on the basis of analyzing the status of Liuzhou railway hub, the designed transport ability, the project investment, the technical features of the rail, and the existing railway equipment, this paper stutied the planning annual programs of each rail and the program on the passenger and cargo layout, aswell as the general diagram of Liuzhou railway hub pattern in the planning year.
出处
《交通运输工程与信息学报》
2013年第3期40-46,共7页
Journal of Transportation Engineering and Information
关键词
铁路枢纽规划
客运系统
货运系统
柳州市
Railway junction planning, passenger and freight stations system, Liuzhou city