乌江沙沱水电站下闸蓄水与梯级协作调度 被引量:1

Impoundment and cascade joint-operation of Shatuo Hydropower Station on Wujiang River
下载PDF
导出
摘要 乌江是我国水电梯级开发最好的水电基地之一,沙沱水电站为乌江干流最后一个投入运行的大型水电站。本文通过分析沙沱水电站工程特点、上下游水库条件等,总结了沙沱水电站下闸蓄水的梯级协作调度方案,该方案也将在沙沱水电站实际下闸蓄水阶段具体实施。 Wujiang River is one of the best bases for the cascade development of hydropower; on which Shatuo Hydropower Sta- tion is the large hydropower station that puts into operation lastly. Through the analysis on the characteristics, the conditions of both the upstream and downstream reservoirs, etc. , the cascade joint-operation scheme for the impoundment of the hydropower station are summarized herein, and this scheme is to be implemented for the actual impoundment concerned.
作者 范国福
出处 《水利水电技术》 CSCD 北大核心 2013年第8期89-93,共5页 Water Resources and Hydropower Engineering
关键词 乌江 沙沱水电站 下闸蓄水 梯级协作调度 Wujiang River Shatuo Hydropower Station impoundment cascade joint-operation