大型机械化水平分层充填采矿法在某金矿的应用 被引量:2

Application of large mechanized horizontal cut-and-filling stoping method in a gold mine
下载PDF
导出
摘要 贵州某金矿井下生产采用凿岩台车、铲运机、大型矿用卡车、混凝土湿喷车及装药车等配套的机械化水平分层充填采矿法。矿山采用斜坡道开拓,中段高度60m,分段高度20m,分层回采高度5m。垂直矿体走向布置穿脉道,沿矿体走向布置采场,不留矿柱,进行胶结充填。充填结果显示,采矿综合回收率达到95%以上,贫化率小于5%。2012年生产性单位成本为27.33$/t。生产实践表明,该无轨采矿工艺技术先进,安全可靠,对国内其他无轨矿山建设具有示范作用和参考价值。 Mechanized horizontal cut-and-filling stoping method is applied in a gold mine in Guizhou Province. Large mining machines are introduced such as jumbo, LHD, large mining truck, spray machine and explosive truck etc. The mine is developed by decline system and the height of level and subsection are 60 meters and 20 meters re- spectively. Mining layer height is 5 meters. Cross cut is designed perpendicular to the ore body, and stopes are dis- tributed along the ore bodies. Cemented filling is used and no ore pillar is left. The overall recovery rate exceeds 95% with the dilution rate less than 5%. Unit operation cost is 27.33 $/t in 2012. Production practice shows that this trackless mining technique is advanced and safe, and it is helpful for domestic trackless mining.
出处 《有色金属(矿山部分)》 2013年第5期7-10,共4页 NONFERROUS METALS(Mining Section)
基金 国家高技术研究发展计划(863计划)项目(2011AA060407) 湖南省研究生科研创新项目(CX2011B116)
关键词 无轨开采 大型机械 充填采矿法 trackless mining large machinery cut-and-filling stoping method
  • 相关文献

参考文献3

二级参考文献21

  • 1卢平.制约胶结充填采矿法发展的若干充填体力学问题[J].黄金,1994,15(7):18-22. 被引量:29
  • 2Malmgren L,Nordlund E,Rolund S.Adhesion strength and shrinkage of shotcrete[J].Tunneling and Underground Space Technology,2005,20(1):33-48.
  • 3LI Chun-lin.Rock support design based on the concept of pressure arch[J].International Journal of Rock Mechanics and Mining Sciences,2006,43(7):1083-1090.
  • 4Liu K Y,Qiao C S,Tian S F.Design of tunnel shotcrete-bolting support based on a support vector machine[J].International Journal of Rock Mechanics and Mining Sciences,2004,41(1):768-773.
  • 5Lee S P,Kim D Y,Ryu J Y.An experimental study on the durability of high performance shotcrete for permanent tunnel support[J].Tunneling and Underground Space Technology,2006,21(3):431-435.
  • 6Jeon S,You K,Park B,et al.Evaluation of support characteristics of wet-mixed shotcrete with powder type cement mineral accelerator[J].Tunneling and Underground Space Technology,2006,21(3):425-426.
  • 7Malmgren L,Nordlund E.Behaviour of shotcrete supported rock wedges subjected to blast-induced vibrations[J].International Journal of Rock Mechanics and Mining Sciences,2006,43(6):593-615.
  • 8Goel R K,Swarup A,Sheorey P R.Bolt length requirement in underground openings[J].International Journal of Rock Mechanics and Mining Sciences,2007,44(5):802-811.
  • 9Hutchinson D J,Diederichs M S.Cablebolting in underground mines[M].British Columbia:BiTech Publishers Ltd,1996:177-218.
  • 10Hoek E,Kaiser P K,Bawden W F.Support of underground excavations in hard rock[M].Netherlands:AAA Balkema Press,1998:27-174.

共引文献92

同被引文献19

引证文献2

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部