期刊文献+

乐山港一期工程通航水流条件及改善措施初探 被引量:1

Study on Navigable Flow Condition and Improving Measures of the First Phase Project of Leshan Harbor
原文传递
导出
摘要 乐山港一期工程位于岷江老木孔航电枢纽库区右岸,地处老江坝江心洲右汊出口附近。受分汊出口水流的影响,拟建港区存在斜流与回流,对船舶进港、出港、停泊、装卸作业及港池水深维护等有一定的影响。为弄清洲尾的通航水流条件,在物理模型试验的基础上结合天然实测资料,研究了老江坝分汊汇流区附近的水流条件,进而提出了改善其通航水流条件的优化布置方案。研究结果表明,调顺陆域岸线结合挖除洲尾的方法对改善分汊出口水流条件的效果较明显。 The first phase proposed project of Leshan harbor is located in the reservoir area on the right bank of the Minjiang I.aornukong avionics hub, near to the outlet of right branch of Laojiangba. Affected by the right branching ex- port flow, the proposed port area exist certain inclined flow and reflux flow, and have a certain impact on the ship into the port, berthing, loading, unloading operations and water depth maintenance of harbor basin. In order to clarify the naviga- ble flow conditions, combined with natural measured data on the basis of the physical model tests, flow condition of Lao jiangba and optimization layout program of improving its navigable flow conditions are studied. The research results show that regulating land area combined with the excavation of channel island tail can improve flow conditions of the outlet of right branch significantly.
出处 《水电能源科学》 北大核心 2013年第10期74-78,共5页 Water Resources and Power
基金 重庆市自然科学基金资助项目(cstc2012jjA30002) 省部共建水利水运工程教育部重点实验室暨国家内河航道整治工程技术研究中心开放基金资助项目(SLK2012A02) 重庆市教委科学技术研究基金资助项目(KJ110409)
关键词 岷江 通航水流条件 改善措施 模型试验 Minjiang river navigable flow condition improving measures model test
  • 相关文献

参考文献10

二级参考文献42

共引文献118

同被引文献11

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部