摘要
利用数学模型 ,研究浦东国际机场围堤龙口在施工期涨潮和落潮时的流速大小和流场分布 ,拟定龙口宽度和龙口保护范围 ,为施工期龙口保护和龙口合龙提供依据 .
In order to extend construction area of Shanghai Pudong International Airport beach reclamation on the south side of the Yangtze River is planned.The study is presented the result of 2?D hydrodynamic model.Based on flow velocity and its distribution in construction stage during the tide the width and the scope of protection of the month is proposed,providing a basis for the month prectection and closure.
出处
《水利水电科技进展》
CSCD
2000年第6期36-38,共3页
Advances in Science and Technology of Water Resources