摘要
通过对 F2 1 5 断层水泥化学材料复合灌浆试验成果的分析研究 ,进一步论证了试验设计方案、工艺及处理标准的合理性 ,为确定类似三峡工程 F2 1 5
Through the analysis of test results on compound grouting with cement and chemical materials used in treating fault F 215 ,the reasonableness of experimental design scheme,technological process and treatment criterion are further expounded.The basis for determining the treatment measures of fault resembling TGP's fault F 215 is provided.
出处
《长江科学院院报》
CSCD
北大核心
2000年第6期9-11,17,共4页
Journal of Changjiang River Scientific Research Institute
关键词
复合灌浆
三峡工程
断层处理
水泥化学浆材
experimental research
compound grouting
Three Gorges Project(TGP)
fault treatment