7L Sunde,S Lichtenberg.Net-present-value cost/time tradeoff[J].International Journal of Project Management.1995(1)
8Chen, Ming-Kuen,Hsu, Shin-Peng.Fuzzy-critical-chain-based project management[].Journal of the Chinese Institute of Industrial Engineers.2004
9Erenguc, S.Selcuk,Tufekci, Suleyman,Zappe, Christopher J.Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition[].Naval Research Logistics.1993
10Shou Y,Yeo K T.Estimation of project buffers in critical chain project management[].Proceedings of the IEEE international conference on management of innovation and technology ICMIT.2000
4Project Management Institute, A Guide to The Project Management Body of Knowledge, PMI Standard Committee, 2000.
5Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SCSC, Chicago, Illinois: Probus Publishing Company, 1992.
6Navy, Special Projects Office, Bureau of Ordnance, Department of the Nevy, Project PERT, Washington DC. 1958.
7NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration. DOD and NASA Guide PERT/COST, Washington, DC. 1962.
8Fleming, Quentin W., and Joel M Koppelman, "Earned Value Project Management", Cost Engineering, Vol.39, No.2, Feberary, 1997.
9Abba, Wanyne Y., "Earned Value Management—Reconciling Government and Commercial Practices: For People Involved in Earned Value—Government, Industry, Academic, or Consulting—These Are Exciting Times", PM: Special Issue, January-February, 1997.
10Fleming, Quentin W., and Joel M. Koppelman, "Earned Value Project Management—A Powerful Tool for Software Projects" Crosstalk the Jounal of Deffence Software Engineering, July 1998.