摘要 由于环境等因素的影响,研制阶段制定的初始备件方案在使用初期常常无法满足装备保障要求.针对该现状,以装备的初始备件方案为先验信息,结合其使用阶段的备件消耗特性,利用Bayes方法,对其工作失效率进行了估计,并在此基础上,提出了装备使用初期的备件配置数量调整方法.仿真结果表明利用该方法调整后的备件数量能够满足装备的保障要求,与传统方法相比,本方法具有较高的估计精度和稳健性,能够更加合理配置备件方案. Because of the environment and so on, the spare number of initial spare scheme can't meet the equipment support requirement when the equipments are in incipient operation. Aim at these statuses, the initial spare scheme was used as prior information. And then the regulate method of spare in incipient operation was proposed based on the Bayes method. Finally, the simulation example shows that the method proposed is feasibility. Comparing with classical method, the method proposed can improve the accuracy of estimation and has good steadiness. So the more rational spare scheme can be formed.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2013年第11期2967-2971,共5页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(50775218) 总装预研项目(51327020105 51304010206) 海军工程大学博士生创新基金(HGBSJJ2011009)
关键词 初始备件方案 调整方法 先验分布 贝叶斯方法 initial spare scheme regulated method prior distribution Bayes method
  • 相关文献

参考文献16

  • 1de Smidt-Destombes K S, Van der Heijden M C, Van Harten A. On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out[J]. European Journal of Operational Research. 2006. 174: 182-200.
  • 2霍佳震,李虎.零备件库存多点转运的批量订货模型与算法[J].系统工程理论与实践,2007,27(12):62-67. 被引量:28
  • 3Newby IVI. Moniioring and mntenance of spares and one shot devices[J]. Reliability Engineering and System Safety, 2008, 93(4): 588-594.
  • 4Kurt M, Kharoufeh J P. Optimally maintaining a Markovian deteriorating system with limited imperfect re- pairs[J]. European Journal of Operational Research, 2010, 205(2): 368-380.
  • 5Akcalt E, Davis M, Hamlin R D, et al. A decision support system for spare parts management in a wafer fabrication facility[J]. IEEE Transactions on Semiconductor Manufacturing, 2001, 14(1): 76-78.
  • 6郭波,陈童,黄卓,张涛.航空发动机组合维修策略的备件需求规律[J].系统工程理论与实践,2010,30(5):769-777. 被引量:10
  • 7聂涛,盛文,王晗中.装备备件两级闭环供应链库存优化与分析[J].系统工程理论与实践,2010,30(12):2309-2314. 被引量:13
  • 8Huiskonen J. Maintenance spare parts logistics: Special characteristics and strategic choices[J]. International Journal of Production Economics, 2004, 71:125 -133.
  • 9Vaughan T S. Failure replacement and preventive maintenance spare parts ordering policy[J]. European Journal of Operational Research, 2005, 161(1): 183-190.
  • 10王正,谢里阳,李兵.零件动态可靠性建模及早期失效率研究[J].航空学报,2007,28(6):1378-1382. 被引量:6

二级参考文献68

共引文献64

同被引文献83

  • 1傅惠民.导弹命中精度整体推断方法[J].北京航空航天大学学报,2006,32(10):1141-1145. 被引量:9
  • 2Sleptchenko A,van der Heijden M C,van Harten A.Effects of finite repair capacity in multi-echelon,multi-indenture service part supply systems[J].International Journal of Production Economics,2002,79(3):209-230.
  • 3Rustenburg W D,van Houtum G J,Zijm W H M.Spare parts management at complex technology-based organizations:An agenda for research[J].International Journal of Production Economics,2001,71(1):177-193.
  • 4Sherbrooke C C.METRIC:A multi-echelon technique for recoverable item control[J].Operations Research,1968,16(1):122-141.
  • 5Loo H L,Ek P C,Suyna T,et al.Multi-objective simulation based evolutionary algorithm for an aircraft spare parts allocation problem[J].European Journal of Operational Research,2008,189(2):325-341.
  • 6Robert C K,Tovey C.Estimating spare requirements with commonality and redundancy[J].Journal of Spacecraft and Rock-ets,2007,44(4):977-984.
  • 7Nosoohi I,Hejazi S R.A multi-objective approach to simultaneous times[J].Applied Mathematical Modeling,2011,35(3):1157-1166.
  • 8Ward R,Ruud T,Willem V J.A two-step method for forecasting spare parts demand using information on component repairs[J].European Journal of Operational Research,2012,220(2):386-393.
  • 9Molenaers A,Herman B,Liliane P,et al.Criticality classification of spare parts:A case study[J].International Journal of Production Economics,2012,140(2):570-578.
  • 10Francesco C,Giulio D G,Massimo T.Multi-echelon,multi-indenture spare parts inventory control subject to system availability and budget constraints[J].Reliability Engineering & System Safety,2013,119(11):95-101.

引证文献5

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部