钻井历史数据分析利用的新视角与启示 被引量:10

New Perspective and Revelation of Analysis and Utilization of Drilling History Data
下载PDF
导出
摘要 通过对钻井历史数据进行可视化分析,得出深井钻井最后500m井段具有在全井钻井周期与完井周期中占比高、事故占比高、解卡成功率低、处理事故耗时长等特殊现象,简要分析了其形成原因,并就创新提速管理模式、优选提速井段、改进钻井设计、确保精细操作的持续性、优化事故处理决策等方面提出了建议。 Through the visual analysis of drilling history data, it is tound thal in drilling the final 500m of a well, drilling lime ralin and aceidenl ratio are high, unfreezing success ralio is low and the time ratio for dealing with accident is high. The factors causing the phenomena are analyzed, and some suggests are proposed on innovating management mode for increasing drilling speed, optimizing well segment in which drilling speed can be increased, improving drilling design, ensuring the eontinuity of fine operation and opti- mizing accident dealing with decision-making.
出处 《石油工业技术监督》 2013年第11期19-23,共5页 Technology Supervision in Petroleum Industry
关键词 钻井数据 数据挖掘 视行程钻速 钻井进度 钻井事故 drilling dala data mining apparent strnke drilling speed drilling schedule drilling accident
  • 相关文献

参考文献3

  • 1孙海芳,钱浩东,杨成新,等.利用钻井数据库搭建远程钻井辅助决策规划[J].钳采工艺,2011,34(6):l-3.
  • 2连志龙,周英操,申瑞臣,赵庆,白仙莉.无意外风险钻井(NDS)技术探讨[J].石油钻采工艺,2009,31(1):90-94. 被引量:28
  • 3赵连胜,行飞.数据挖掘的任务、对象和方法[J].内蒙专大学学报:自然科学版.2002,33(2):236-240.

二级参考文献13

  • 1CHRIS Rhodes. Intelligent planning reduces nonproductive drilling times [ J ] . Oilfield Review, 2001, 13(2): 1-4.
  • 2LAURENCE Cahuzac, CHIN Yuin Hui, SEDCO Forex, et al. Managing drilling risk[ J ]. Oilfield Review, 1999, 11 (2): 2-20.
  • 3WALT Aldred, IAIN Cooper, CENGIZ Esmersoy, et al. Avoiding drilling problems [ J ]. Oilfield Review, 2001, 13 (2): 32-51.
  • 4AMIN Amin, SAAD Bargach, JIM Donegan, et al. Building a knowledge-sharing culture [ J ] . Oilfield Review, 2001, 13 ( 1 ): 48-65.
  • 5LESTER Bayne, CARACAS, PAOLO Censi, et al. Lifelong asset management using the web [ J ]. Oilfield Review, 2001, 13(4): 42-57.
  • 6PATRICK Hooyman, RICHARD Plumb, DANIEL Bordelon. Minimizing drilling surprises in deepwater goal of ‘live' drilling plan [ J ]. Offshore, 2001.10, 61(10).
  • 7RICHARD Plumb, STEPHEN Edward, GARY Pidcock, et al. The mechanical earth concept and its application to highrisk well construction projects [ R ] . IADC/SPE 59 128, American, 2000.
  • 8USMAN Ahmed, KAREN Glaser, EDUARD Siebrits, et al. Watching rocks change-mechanical earth modeling [ J J . Oilfield Review, 2003, 15 (2): 22-39.
  • 9VAN OORT E, NICHOLSON J, AGOSTINO J D. Imegrated borehole stability studies: key to drilling at the technical limit and trouble cost reduction [ R ] . SPE/IADC 67 763, American, 2001.
  • 10TORRES M E, FRYDMAN M, CASALIS D, et al. 3D Analysis for wellbore stability: reducing drilling risks in Oriente Basin, Ecuador[ R ] . SPE 94 758, American, 2005.

共引文献27

同被引文献44

引证文献10

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部