6M R Alam,K S Lee,M Rahman,et al.Automated Process Planning for the Manufacture of Sliders[J].Computers in Industry,2000,43:249-262.
7K S Lee,M R Alam,M Rahman,et al.Automated Process for the Manufacture of Lifters[J].Intemational Journal Advanced Manufacturing Technology,2001,17 (10):727-734.
5ALEMANNI M, DESTEFANIS F, VEZZETTI E. Model- based definition design in the product lifecycle management scenarioEJ. International Journal of Advanced Manufacturing Technology, 2011,52 (1/2/3/4) : 1 14.
6QUINTANA V, RIVEST L, PELLERIN R, et al. Will mod- el-based definition replace engineering drawings throughout the product lifecycle? a global perspective from aerospace industry EJ. Computers in Industry, 2010,61(5) .. 497-508.
7DING Lian, DAVIES D, MCMAHON C A. The integration of lightweight representation and annotation for collaborative design representation[J]. Research in Engineering Design, 2009,20(3) : 185-200.
8K.S. Lee,M.R. Alam,M. Rahman,Y.F. Zhang. Automated Process Planning for the Manufacture of Lifters[J] 2001,International Journal of Advanced Manufacturing Technology(10):727~734
9H. B. Marri,A. Gunasekaran,R. J. Grieve. Computer-aided process planning: A state of art[J] 1998,The International Journal of Advanced Manufacturing Technology(4):261~268
3Alizon F,Shooter S B,Simpson T W. Reuse of manufacturing knowledge to facilitate platform-based product realization[J]. Journal of Computing and Information Science in Engineering, 2006,06(02): 170.