摘要
上海新世界名品城项目位于上海市中心繁华地带,施工环境极其复杂,社会影响大,是上海近期难度最大的深基坑工程之一。通过合理的施工方法和严密的监控措施,保证了深基坑开挖过程中围护结构自身和周边环境的安全。以基坑1区为例,对从土方开挖到基础底板浇筑完成过程中所监测的有关数据进行分析和探讨。
Shanghai New World Famous Brand City project locates in central Shanghai city with extremely complex construction environment and great social effect. It is recently one of the most difficult deep foundation excavation engineering in Shanghai. Through the reasonable construction method and strict monitoring, the safety of retaining structure and the surrounding environment of deep foundation excavation can be ensured in the process of excavation. Taking No. 1 area of the foundation excavation as an example, this paper analyzes and discusses the monitoring data from the earthwork excavation to foundation slab casting finished.
出处
《施工技术》
CAS
北大核心
2013年第21期92-95,共4页
Construction Technology
关键词
地铁
深基坑
地下连续墙
变形
subway
deep foundation excavation
diaphragm wall
deformation