摘要
针对山西省陵川县磨河水库工程,分别从施工期和运行期两个阶段对该工程环境影响因素(包括大气污染、水污染、噪声污染、固废排放、生态破坏等)进行了分析,从而提出了相应的环境保护措施,有效地减缓了该工程建设对当地环境造成的影响。
Being aimed at the Lingchuan Mohe Reservoir Project in Shanxi Province, separately from two periods of this project, ie construction period and operation period, the paper analyzes the environmental impact factors of project, including air pollution, water pollution, noise pollution,solid waste emissions, ecological damage and so on, thus puts forward the corresponding environmental protection measures which can effectively alleviate the impact of the project construction on the local environment.
出处
《山西水利科技》
2013年第4期87-89,共3页
Shanxi Hydrotechnics
关键词
磨河水库
环境影响
环境保护措施
Mohe Reservoir
environmental impact
environmental protection measures