摘要
西部新城中水处理站工程日处理规模2.6万t,用地指标1.03 m2/(m3·d)。设计采用改进的A2/O生物脱氮除磷工艺。总平面布置以构筑物合建为主,注重近远期合理布置,且将景观园林融入中水处理站设计中,形成生态公园式的污水处理厂。对工艺参数及设计特点进行详细阐述,其经验可供借鉴与推广。
The scale of the wastewater treatment plant of the West New Towns in Tanggu was 26 000 tons per day, and the land-utilization target was 1.03 m2/(m3 d). In the design of the plant, the improved A^O process was applied. Particular attention was paid to reasonable link between the current design and the future design on plane layout,and the idea of a park was integrated into the design, the plant would be a garden sewage treatment plant after constructed. Process parameters and engineering design features were stated in detail. Its experience can be referred and popularized by other similar projects.
出处
《环境工程》
CAS
CSCD
北大核心
2013年第6期5-7,共3页
Environmental Engineering
关键词
改进A2
0工艺
构筑物合建
用地指标
生态公园式污水厂
improved A20 process
combined construction
land-utilization target
garden wastewater treatment plant