摘要
随着智能变电站技术的不断发展以及建设方案的日益复杂,智能变电站长期的运行性能对其建设模式提出了要求。文中在国网公司现有智能变电站典型建设方案的基础上,介绍了江苏电网已投运的500 kV天目湖智能变电站二次系统中的新技术应用,在满足运行可靠性的前提下,提出了进一步推广一、二次设备结合程度,提高智能变电站信息融合水平,实现二次设备功能优化。
With the continuing evolve of smart substation technology, as well as the increasing complexity of construction scheme, the long-term operating performance of smart substation has proposed requirements to construction mode. This paper introduces new technical application of secondary system in the 500 kV TIAN-Muhu substation based on the State Grid's existing typical building program. On the premise to meet operational reliability, it proposes to promote a further combination of secondary equipment and to increase information fusion level of smart substation, which will achieve the secondary device function optimization.
出处
《江苏电机工程》
2013年第6期51-54,共4页
Jiangsu Electrical Engineering
关键词
智能变电站
建设技术
智能组件
Smart Substation, Construction Technology, Unification of Relay and Control