摘要 针对目前吉林电网接纳大规模风电存在的主要问题,从电网建设、电源结构、国家政策等方面对出现问题的主要原因进行了分析。同时,结合吉林电网的实际情况,有针对性地提出了提高风电接纳能力,促进风电可持续发展的相应措施。
出处 《吉林电力》 2013年第6期7-9,共3页 Jilin Electric Power
  • 相关文献

参考文献3

二级参考文献14

  • 1Ronan D, Eleanor D, Mark O'. System operation with a significant wind power penetration[C]. IEEE Power Engineering Society General Meeting, Denver, 2004.
  • 2Holttinen H. The impact of large scale wind farm integration in nordic countries[D]. Espoo, Finland: HelsinkiUniversity, 2004.
  • 3Holttinen H. Hourly wind power variations in the Nordic countries[J]. Wind Energy, 2005, 8(2): 173-195.
  • 4Ronan D, Mark O. A new approach to quantify reserve demand in systems with significant installed wind capacity[J]. IEEE Trans on Power Systems, 2005, 20(2): 587-595.
  • 5Holttinen H. Impact of hourly wind power variations on system operation in the Nordic couna'ies[J]. Wind Energy, 2005, 8(2): 197-218.
  • 6Goran M, Davor B. Impact of wind power plants on power system operation in Croatia[C]. International Conference on clean Electrical Power, Gapri, 2007.
  • 7Eriksen P B, Ackermann T, Abildgaard H, et al. System operation with high wind penetration[J]. IEEE Power and Energy Magazine, 2005, 3(6): 65-74.
  • 8Hadi B, Luo Changling, Boon T O. Impacts of wind power minute-to-minute variations on power system operation[J]. IEEE Trans on Power Systems, 2008, 23(1): 150-160.
  • 9中国电力工程顾问集团西北电力设计院.甘肃洒泉风电基地输电规划[R].西安:中国电力工程顾问集团西北电力设计院,2008.
  • 10Zhang Ning, Kang Chongqing, Duan Changgang, et al. Simulation methodology of multiple wind farms operation considering wind speed correlation[C]. The Third IASTED Asian Conference on Power and Energy Systems, Beijing, 2009.

共引文献402