期刊文献+

管道压力试验装水时间计算 被引量:1

Calculation of the Time Needed in Water-filled in Pressure Pipe
下载PDF
导出
摘要 在管道安装等工程中,准确地估算试压装水时间对工程很重要。文中利用流体力学理论对压力管道的装水过程进行模型化,从而选取适当的理论计算公式,并根据流动状态选取适当的计算参数,对沿程阻力损失等还需要采取迭代的方法进行计算,从而得到了较准确的结果。通过计算发现,计算结果的准确性取决于建立适当的水力学模型以及合理边界条件的设置。 Accurately calculating the time for water-filling of the pipe or vessel is needed in an engineering project. Based on the classical hydromechanics,a hydraulic model for engineering is built in this paper,and hypothesis boundary conditions are given to calculate the time. In addition,the iteration method is used to calculate the frictional resistance factor,and the calculated result has fullfilled the engineering need. It is found that the calculation accuracy depends on the suitable hydraulic model and the appropriate boundary conditions.
出处 《管道技术与设备》 CAS 2013年第6期49-51,共3页 Pipeline Technique and Equipment
关键词 流体力学 压力管道 水压试验 装水时间 hydromechanics pressure pipe hydromechanics test time needed for filling
  • 相关文献

参考文献5

二级参考文献7

共引文献26

同被引文献7

  • 1游德文.管道安装工程.北京:化学工业出版社,2004.
  • 2建筑给水排水及采暖工程施工质量验收规范(GB50242-2002),2002.
  • 3APP-GW-P0-007 AP1000 Specification for Shop Fabri- cated Piping.
  • 4APP-GW-P0-008 AP1000 Specification for Field Fabri- cated Piping and Installation.
  • 5ASMEB31.1-2001动力管道.
  • 6APP-PY87-Z0-001地漏设计规范.
  • 7罗保,李何成,许经纲.高压管道安装技术[J].管道技术与设备,2001(4):14-17. 被引量:2