基于CIVA仿真核电站传热管涡流检测参数的选择 被引量:1

Choice of Eddy Current Testing Parameters Used in Nuclear Power Steam Generator Tube Based on CIVA Numerical Simulation
下载PDF
导出
摘要 利用CIVA软件平台,采用内穿式差动Bobbin线圈对核电站蒸汽发生器传热管涡流检测进行数值模拟;对传热管内外壁缺陷数值模拟,确定检测时的最佳频率,并与理论计算值进行对比;数值模拟差动式探头2线圈之间间隔大小L、线圈宽度b和周向槽缺陷宽度l对检测结果的影响;利用上述CIVA数值模拟的结果分析相应的变化规律,为应用差动Bobbin线圈对核电用传热管进行涡流检测时线圈参数的选择提供了重要的理论参考依据和实用价值。 CIVA simulation software platform was used to study the eddy current testing of the steam gener-ator tube for nuclear power plant with the differential bobbin coil. With numerical simulation, the optimal frequency of detection of the inner and outer walls of the SG tube defects were determined and the theoreti-cal values were compared. The interval size between the probe coil, the coil width and the circumferential groove defect width were used to study the influence on the detect results. In order to find the correspond-ing orderliness, the numerical simulation result from CIVA is used to analyze, which can supply a very im-portant theoretical significance and practicality for eddy current testing used by differential bobbin coil in nuclear power plant.
出处 《四川兵工学报》 CAS 2013年第12期91-95,共5页 Journal of Sichuan Ordnance
关键词 涡流检测 CIVA数值模拟 差动线圈 SG传热管 eddy current testing CIVA simulation differential coil SG tube
  • 相关文献

参考文献10

  • 1Do Haeng Hur,Deok Hyun Lee,Myung Sik Choi. Discrimination method of through-wall cracks in steam generator tubes using eddy current signals[J].{H}NDT & E International,2006,(39):361-366.
  • 2刘一舟,曹刚,王晓翔.核电站钛管内壁缺陷判伤曲线[J].无损检测,2010,32(9):719-721. 被引量:7
  • 3Hur D H,Choi M S,Lee D H. Effect of shot peening on primary water stress corrosion cracking of alloy 600steam generator tubes in an operating PWR plant[J].{H}Nuclear Engineering and Design,2004,(227):155-160.
  • 4Sandra Pagan,Xinjian Duan,Michael J.Kozluk. Characterization and structural integrity tests of ex-service steam generator tubes at Ontario Power Generation[J].{H}Nuclear Engineering and Design,2009,(239):477-483.
  • 5任尚坤,孙大朋.基于有限元仿真的核电站传热管涡流检测[J].无损检测,2012,34(4):26-30. 被引量:4
  • 6贝雅耀,王小刚,宋涛,王可庆,黄春明.CIVA仿真对核电站蒸汽发生器传热管涡流检验技术的应用评价[J].无损检测,2011,33(6):5-9. 被引量:2
  • 7白小宝,江运喜,梁菁,王铮,董世运.CIVA仿真软件的实际应用[J].无损检测,2011,33(10):36-39. 被引量:23
  • 8C.Gillers-Pascaud;G.Pichenot;D.Premel.Modeling of Eddy Current inspections with CIVA[A]{H}上海,200825-28.
  • 9Denis Prémel,Decitre J M,Pichenot G. Simulation of eddy current inspection including magnetic field sensor such as a giant magneto resistance over planar stratified media components with embedded flaws[A].2011.655-662.
  • 10李家伟;陈积懋.无损检测手册[M]{H}北京:机械工业出版社,2001.

二级参考文献17

  • 1JB/T4730.6-2005承压设备无损检测第6部分:涡流检测[S].
  • 2李家伟,陈积懋.无损检测手册[M].北京:机械工业出版社.2001.
  • 3ASME锅炉及压力容器委员会无损检测分委员会.ASME锅炉及压力容器规范(2004版)第Ⅴ卷第Ⅷ章附录Ⅰ,2004.
  • 4Xing Lingling. Rapid calculation of eddy current field Green's function using the matrix pencil method[J]. NDT&E International, 2009 (42) .. 85 - 91.
  • 5Theodoros Theodoulidis, Nikolaos Poulakis, Athanasios Dragogias. Rapid computation of eddy current signals from narrow cracks[J]. NDT&E-International, 2010(43) : 13-19.
  • 6LIANG Jing, WANG Zheng, SH1 Yiwei. Ultrasonic inspection of thick parts with phased array dynamic fo- cusing[EB/OL]. [2011-03-16]. http://www, idspek- tr. ru/10ECNDT/reports/1_03_91, pdf.
  • 7Do Haeng Hur,Deok Hyun Lee,Myung Sik Choi,etal.Discrimination method of through wall cracks insteam generator tubes using eddy current signals[J].NDT&E International,2006,39(5):361-366.
  • 8Hur D H,Choi M S,Lee D H,et al.Effect of shotpeening on primary water stress corrosion cracking ofalloy 600steam generator tubes in an operating PWRplant[J].Nuclear Engineering and Design,2004,227(2):155-60.
  • 9Sandra Pagan,Xinjian Duan,Michael J Kozluk,et al.Characterization and structural integrity tests of ex-service steam generator tubes at Ontario Power Gener-ation[J].Nuclear Engineering and Design,2009,239(3):477-483.
  • 10何文艳,谢东华,赵海晏.小直径铝管涡流检测技术[J].南昌航空大学学报(自然科学版),2007,21(8):33-37.

共引文献31

同被引文献5

引证文献1