以某在建旋流井地下连续墙施工为例,通过对工程地质条件及岩土工程的分析与评价,确定了塌陷区影响范围,对地基处理、旋流井土方开挖、流砂现象的处理等提出建议,以确保工程顺利开展。
Taking the underground continuous wall construction of a under construction cyclone well as an example, through the analysis and eval uation to engineering geology situation and geotechnical engineering, ensured the influence range of subsidence area, put forward suggestion for foundation treatment, cyclone well earthwork excavation, quicksand treatment etc. , to ensure the smoothly development of project.
出处
《山西建筑》
2014年第4期71-72,共2页
Shanxi Architecture
关键词
地下连续墙
塌陷区
流砂
建议