期刊文献+

Research on controlling long-term performance by tensioning post tendon of long-span continuous rigid-frame bridges 被引量:1

Research on controlling long-term performance by tensioning post tendon of long-span continuous rigid-frame bridges
下载PDF
导出
摘要 The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-flame bridge. Post-tension tendon with re- served duct can increase the pre-stress of the main beam effectively, and decrease the long term span deflection in order to improve the performance of the girder. At the same time, the proper tension position is very crucial to optimise the stress distribution of the bridge and control the deflection increase. Combining with practical en- gineering, the authors analyze the influence of different positions of post-tension tendon ( including top-, web- and bottom plate tendons) on the stress and deflection of the main beam, and find out the optimal position of post tendon. The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-frame bridge.Post-tension tendon with reserved duct can increase the pre-stress of the main beam effectively,and decrease the long term span deflection in order to improve the performance of the girder.At the same time,the proper tension position is very crucial to optimise the stress distribution of the bridge and control the deflection increase.Combining with practical engineering,the authors analyze the influence of different positions of post-tension tendon(including top-,weband bottom plate tendons)on the stress and deflection of the main beam,and find out the optimal position of post tendon.
出处 《Global Geology》 2013年第4期213-216,共4页 世界地质(英文版)
关键词 continuous rigid-frame bridge long term performance post tendon optimal tension position 大跨度连续刚构桥 长期性能 肌腱 控制 张紧 垂直偏转 最佳位置 后张力
  • 相关文献

参考文献4

  • 1Hui S C,J C C,K C C. Long-term deflection control in cantilever prestressed concrete bridges I:control method[J].{H}Journal of Engineering Mechanics,1996,(06):489-494.
  • 2Hui S C,Jenn C C,K C C. Long-term deflection control in cantilever prestressed concrete bridges Ⅲ:Experimental Verification[J].{H}Journal of Engineering Mechanics,1996,(06):495-501.
  • 3Fan L C. Bridge project(part II)[M].Beijing:China Communications Press,2007.125-128.
  • 4Ye J S. Structure design principle[M].Beijing:China Communications Press,2005.282-286.

同被引文献14

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部