Prevision of Delay in Brazilian Residential Unit Construction Contracts

Prevision of Delay in Brazilian Residential Unit Construction Contracts
下载PDF
导出
摘要 The aim of this paper is to verify the existence of a clause in contracts of promise of property sale which defines the consequences of delay in the delivery of property, and to discover whether owners demanded any compensation for delays occurred. The number of buildings delivered after the scheduled deadline in two cities between December 2009 and January 2011 was found (n = 542), and a sample of 82 residential units was taken. In order to obtain the data, a semi-structured questionnaire was given to the homeowners. It was observed that only 35% (n = 29) of the contracts included a penalty clause for delay. However, in 19 of the 29 contracts the clause regarding delay came with other clauses that allowed the company to delay the delivery of the building for up to six months. This clause is considered null in Brazilian legislation. As for compensation, only one (1.82%) owner demanded that the company provide a rental property during the period of delay. It could be concluded that contractors are not observing Brazilian legislation regarding the delay in the delivery of residential units. In addition, conformism is perceived in the attitude of the homeowners.
出处 《Journal of Civil Engineering and Architecture》 2014年第1期100-106,共7页 土木工程与建筑(英文版)
关键词 DELAY CONTRACTS buildings. 建造合同 延迟期 单位 住宅 巴西 交付 物业 建筑物
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部