摘要
给定一个Flow -Shop网络 ,在资源具备且输出时间一定的条件下 ,网络中的各道工序的开工时间仍可在其最早开工时间和最迟开工时间之间变动 [2 ],由此构成网络中的各种不同的作业计划。本文分析了Flow -Shop网络静态系统不同作业计划对缓冲区容量的影响 。
With enough resources and fixed completion time in a given flow-shop system ,the working time of every process ranges from the earliest to the latest .As a result ,the schedules of Jobs in the system are formed . This essay deals with effects of the schedules of jobs in the static flow-shop system on the capacity of buffers size ,and it indicates the calculating method that the schedules of jobs decide the capacity of buffers size .
出处
《武汉科技学院学报》
2000年第4期47-51,共5页
Journal of Wuhan Institute of Science and Technology