“十二五”期间在贵州东部建设火电电源对贵州电网投资的影响及可行性分析

Analysis on the investment influence and feasibility to construct thermal power supply in Eastern Guizhou during "the Twelfth Five-Year Plan" of Guizhou Power Grid
下载PDF
导出
摘要 根据贵州"十二五"输电网规划,从电网的角度讨论了将"十二五"期规划火电电源从贵州西部迁移到东部建设这一思路的必要性和可行性,并举例论证了该思路在降低电网建设投资方面的作用。最后,从电厂角度简要分析了在贵州东部建设火电厂的经济可行性。 According to the planning for Guizhou power grid during "The Twelfth Five - Year Plan" , from the point of power grid, This paper discussed and the feasibility and the necessity to remove the hermal power supply form Western Guizhou to Eastern Guizhou, and proved the function of idea to reduce power grid construction investment. Finally, the economic feasibility of thermal power plant construction in Eastern Guizhou was analyzed from the point of power grid.
作者 马冲 钟以林
出处 《贵州电力技术》 2014年第2期5-10,91,共7页 Guizhou Electric Power Technology
关键词 火电电源 投资 经济可行性 thermal power supply investment economical feasibility
  • 相关文献

参考文献5

二级参考文献17

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部