期刊文献+

黄河内蒙河段改扩建工程冰情分析研究 被引量:1

Study and analysis on ice regime for reconstruction and expansion projects on Inner Mongolia Reach of Yellow River
下载PDF
导出
摘要 黄河内蒙河段改扩建大桥项目较多,易造成冰塞壅水。利用数学模型和水力学法对拟定改扩建工程方案进行了计算,从两个方面评价扩建工程对冰塞壅水的影响。研究内容可为黄河冰情分析提供参考。 More bridge reconstruction and expansion projects are there on the Inner Mongolia Reach of the Yellow River,which can easily cause backwater from ice jam.With mathematical model and hydraulics method,the schemes of the planned reconstruction and expansion projects are calculated,and then the impacts from the projects on the backwater caused by ice jams are evaluated as well.This study can provide some references for the analysis on the ice regime of the Yellow River.
出处 《水利水电技术》 CSCD 北大核心 2014年第1期158-160,163,共4页 Water Resources and Hydropower Engineering
基金 国家重点基础研究发展计划"973"计划(2011CB403306) 水利部公益性行业科研专项项目(201301062)
关键词 冰清分析 数学模型 水力学法 analysis on ice regime mathematical model, hydraulics method
  • 相关文献

同被引文献12

引证文献1

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部